Tags

, ,


Levco-Card-2013-VersionIt looks good!! The floor is installed and looks super. The bidet is installed and passed the leak test – no leaks! We even brought the sink back in and re-installed it. All in all – We are happy with the way the remodel is going and turning out! But then, we have a great crew. The basement water pipes are even working well after Don brought the plumbing “up to snuff”. The last big thing is to re-install the tub. I think it will all work together and the bathroom should really look nice. Enjoy these photos. Left-Click any of the photos to see enlarged.

The bidet flange above the "leaky" pipe.

The bidet flange above the “leaky” pipe.

The pipes are fixed in the basement.

The pipes are fixed in the basement.

See? No cracks!!

See? No cracks!!

The floor is installed. We really like it.

The floor is installed. We really like it.

Looks like a "Christmas assembly" project. The bidet will go together.

Looks like a “Christmas assembly” project. The bidet will go together.

The bidet is assembled, plumbed and wired. All works well. Thanks Don and Andy!